
CRT 36 Operation
wc_tx000639gb.fm 29
3.10 Pitch Adjustment
When changing or setting the pitch (angle) of the trowel blades, slow
the machine, set the desired pitch on the left side of the machine, then
adjust the right side to match.
To increase pitch: Rotate the left pitch control
(L) clockwise, rotate the
right pitch control
(R) counterclockwise.
To decrease pitch: Rotate the left pitch control (L) counterclockwise,
rotate the right pitch control (R) clockwise.
3.11 Emergency Shutdown Procedure
Procedure
If a breakdown or accident occurs while the machine is operating,
follow the procedure below:
3.11.1 Stop the engine.
3.11.2 Close the fuel valve.
3.11.3 Remove the machine from the job site using the wheel kit.
3.11.4 Clean concrete from the blades and the machine.
3.11.5 Contact the rental yard or machine owner for further instructions.
Working Conditions of
Concrete
Suggested Working
Pitch
1. Wet surface working
stage
Flat (No Pitch)
2. Wet to plastic working
stage
Slight Pitch
3. Semi-hard working
stage
Additional Pitch
4. Hard finishing stage
(burnishing)
Maximum Pitch
Comentarios a estos manuales