Wacker Neuson Cub 200 Manual del operador Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 50
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
Cub 200/300/300 HD Operation
wcghi_tx000720gb.fm 17
3.4 Mounting the Handle and Base Assembly
See graphics: wcghi_003991 and ghi_gr005319
The Cub series Air Heater machines are shipped partially assembled.
Before operating either machine, use the following procedure to mount
the handles and base assembly. This assembly includes the handle,
base support, and wheels with axles.
Note: There are pre-drilled bolt holes for all the components installed
within this procedure.
Note: The Cub 300 HD requires that only the handle be attached.
Refer to the procedure below to install the handle.
3.4.1 Attach the axles to the sides of the fuel tank using the supplied bolts
and washers.
3.4.2 Install the wheels using a rubber mallet to secure them to the axle
ends.
3.4.3 Attach the base support to the rear of the fuel tank using the supplied
bolts and washers.
3.4.4 Attach the handle to the machine using the supplied bolts (and
washers, if applicable).
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 49 50

Comentarios a estos manuales

Sin comentarios