Wacker Neuson WL 30 Manual del operador Pagina 145

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 246
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 144
S E R V I C I N G A N D I N S P E C TI O N
143
W L 3 0
Tasks to be performed (check) 500 hours inspection
Check the acid level of the battery
Check: Instruments, indicators + audible warning devices
Check the electrical system
Check the foot brake and parking brake, adjust if necessary
Check the hydraulic steering
Check the lighting system – (if present)
Check the exhaust system
Check the hinge pins and joint bushings
Check the center pivot bolts and bearings
Check the idle speed
Check the functioning of the engine enclosure and door locking mechanisms, adjust if necessary
Check the condition of the tires and the tire pressure
Change the engine oil and lter
Change the fuel lter – clean the pre-lter
Clean the fuel feed pump (Deutz engines only)
Clean the air lter, replace if necessary
Vista de pagina 144
1 2 ... 140 141 142 143 144 145 146 147 148 149 150 ... 245 246

Comentarios a estos manuales

Николай 26 Nov 2024 | 09:45:32

Назначение плавких предохранителей