Wacker Neuson CRT 48-31V Manual del operador Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
CRT 48-31V-ES Operation
wc_tx000143gb.fm 21
4.7 Operation
To utilize your WACKER Riding Trowel to its fullest capacity, the
machine should be driven in the direction that the operator is facing.
This will finish the widest possible area, while giving the operator an
excellent view of the slab surface about to be troweled. When the
machine reaches the end of the slab, make a 180° U-turn, and repeat
the straight line of direction to the other end of the slab.
Note: During the break-in period, run the engine at 50% of full throttle.
Refer to Section New Machines.
NOTICE: DO NOT use excessive pressure on the control levers.
Excessive pressure does not increase the reaction time of the machine
and can damage the steering controls.
NOTICE: Attempting to use the trowel too early in the curing stage of
the concrete may result in an undesirable finish. Only experienced
concrete finishers should operate the trowel.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 55 56

Comentarios a estos manuales

Sin comentarios