Wacker Neuson BH 23 Manual del operador Pagina 40

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 39
11 Maintenance
40
11.3 Maintenance schedule
11.4 Maintenance work
Working in the workshop
Perform maintenance work in a workshop on a workbench. This has the following
benefits:
Protection of the machine of contamination on the construction site.
A level and clean work surface makes work easier.
There is a better overview over small parts and they are not lost as easily.
11.4.1 Cleaning machine
Clean the machine after use.
1. Clean the ventilation slots with a suitable tool.
2. Wipe the housing with a damp and clean cloth.
Task Daily be-
fore oper-
ation
Every
20 hrs.
Monthly Annually
Visual inspection of all parts
for damage.
Clean the machine.
Ventilation slots.
Air cleaner.
Check the fuel:
Fuel tank fill level.
Fuel tank for leaks.
Lines for leaks.
Check the tool ends and cut-
ting edges – if required,
sharpen, reforge or replace.
Lubricate the machine.
Clean spark plug – change, if
necessary.
Check tool holder for wear –
have it changed, if
necessary. *
* Have these tasks carried out by the service department of your Wacker Neuson con-
tact person.
Have the fuel filter replaced. *
Vista de pagina 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 67 68

Comentarios a estos manuales

Sin comentarios