GP 4000 Operation
wc_tx000788gb.fm 27
3.7 Grounding the Generator
Location
A ground connection (a) is located on the generator frame.
Function
This ground connection is used for electrically grounding the
generator when necessary to comply with the National Electrical
Code and other federal, state, and local regulations. For grounding
requirements in your area, consult with a qualified electrician,
electrical inspector, or local agency having jurisdiction over electrical
compliance.
If the generator is used at a construction site, there may be
additional regulations which must be observed.
In some areas, generators are required to be registered with local
utility companies.
There is a conductor between the generator (stator neutral
winding) and the frame.
3.8 Operating Heavy Loads
Limit operations requiring the maximum rated output of 4000 W to 20–
30 minutes. For continuous operation do not exceed the continuous
rated output of 3600 W.
NOTICE: DO NOT exceed the current limit specified on the control
panel for any receptacle.