Wacker Neuson EHB 10 series Manual del operador Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 60
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
EHB 11 Operation
27
7Operation
7.1 Prior to starting the machine
After unpacking, the machine is ready for operation.
Checking the machine
f Check the machine and all components for damages.
Checking the mains
f Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter Technical Data).
f Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety.
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 59 60

Comentarios a estos manuales

Sin comentarios